There are two ways to measure and fit vinyl.
Can you install vinyl flooring on concrete.
If the concrete holds moisture however the tiles may.
If you were to remove a cracked tile from concrete undoubtedly you would see the same crack pattern below.
If it comes up easily there s too much moisture in the concrete to install a sheet vinyl floor.
The two most common formats are vinyl plank flooring and vinyl tile.
It is one of the cheapest solutions and at the time of writing it could set you back just a few hundred bucks depending on the size of the area you are covering.
After laying the underlay or vapour barrier or whatever you choose to use it s time to get flooring.
If you have some experience with installing flooring or are diy hobbyist it shouldn t take you more than a day to install vinyl plank flooring on concrete.
You can measure the entire floor area.
Installing self adhesive vinyl tiles over concrete is not always easy especially if you remove carpets from the concrete base.
Cracks in concrete immediately become cracks in the tile.
To install vinyl plank flooring on concrete you ll first need to clean the concrete with soap and water and fill in any cracks with concrete filler.
Cut the vinyl 3 inches wider than the floor area on all sides and then trim the excess after laying it in place.
Then use a level to find any spots where the ground is uneven and apply concrete self leveling compound to even it out.
You leave enough of a gap around the edge that it can expand contract flex whatever but that it s hidden by baseboard.
If you re looking for an easy to install floor covering for a concrete subfloor that will resist wear and look great longer than practically any other flooring material consider vinyl flooring.
Vinyl plank is a floating floor which means you don t ever actually attach it to the underlay.
When you re working on a concrete floor the installation of transitions is different from the way it s done on a typical subfloor installation.
You just lay it over top.
All of the movement in concrete is transferred to the tile.
Piece of vinyl flooring and taping the edges.
If you want to install the tiles properly you should prepare the floor making sure that the surface is clean without any remains of sealers adhesive or anything else.
After 72 hours try to pull up the vinyl.
Allow the new vinyl floor to acclimate to the room by leaving it in the room where it ll be installed for at least 24 hours prior to cutting.
Once you have determined that your concrete floor is not damp you can successfully install self adhesive vinyl tile after removing carpet.